Lighter, stronger, simpler

Site

Al-Aryam Island, Abu Dhabi

Installed

2000

Team

Charlie Paton, Philip Davies  

The second pilot design evolved into a more elegant yet lower cost solution using light but strong steel structure similar to a multi-span polytunnel. This structure was designed to be cost-effective for the extreme conditions of the Middle East and suitable for local sourcing.