• Technology
    • Team
    • Work in progress
    • Tenerife
    • Abu Dhabi
    • Oman
    • Australia
    • Somaliland
  • Services
  • Contact
  • News
  • Blog
Menu

Seawater Greenhouse

2A Greenwood Road
London, England, E8 1AB
+44 (0) 20 7249 3627
Restorative Horticulture Using Sunlight and Seawater

Your Custom Text Here

Seawater Greenhouse

  • About
    • Technology
    • Team
    • Work in progress
  • Projects
    • Tenerife
    • Abu Dhabi
    • Oman
    • Australia
    • Somaliland
  • Services
  • Contact
  • News
  • Blog

Seawater Greenhouse Somaliland Construction is Underway!

August 22, 2017 Charlie Paton
IMG_4275.jpg

Original post by Christopher Rothera on May 5th, 2017

I am very pleased to announce that, three years since the initiation of the Seawater Greenhouse Somaliland project, construction of the pilot has now begun! With a great team assembled, and the guidance of our amazing partners PENHA ( The Pastoral & Environmental Network in the Horn of Africa) who are facilitating the project in-country http://www.penhanetwork.org/, we are optimistic for a smooth and successful installation over the next few months.

Orchestrated by the Director of Seawater Greenhouse, Charlie Paton, and alongside partners PENHA and Aston University, this project aims to provide drought resilience to the agricultural industry in Somaliland. Through best practice in protected agriculture and horticultural science together with our developments in seawater cooling and desalination, we will create the potential for the cultivation of vast tracts of unused, arid land for food production. Somaliland, as well as the majority of the Horn of Africa, is one of the most food insecure countries in the world. With annual yields averaging 0.5 tons per hectare and only 1.6% of the 600,000 km2 country area (FAO) being cultivated. With the new line of Seawater Greenhouses, developed over these three years through research and design, we aim to produce up to 300 tons per hectare.

 

The Site

The site is located 17km west of Berbera, the major port town of Somaliland, and is on the fringe of a large dried up wadi (river).

 

The landscape is arid and blisteringly hot; however the restorative agricultural approach of the Seawater Greenhouse will go a long way to re-hydrating and revitalising the land around the site.

The Construction Team

  • From the Seawater Greenhouse UK Team

    • Christopher Rothera – Construction Manager and Head Design Engineer

    • Karl Fletcher - Head of Business Development

  •  From the Seawater Greenhouse Somaliland Team
    • Hassan Hussein - Greenhouse Manager & Head Horticultaralist

    • Abdihakiim Mohamed Riirassh - Assistant Manager & Horticultaralist

  • From Adam Lloyd Construction, UK Subcontract Team

    • Adam Paton – Construction Specialist

    • Christopher Strange – Construction Specialist

  • Somaliland Support Staff

    • General Labour staff hired from local communities

    • Transportation

    • Site Security

    • Catering

The PENHA Team

  • Sadia Ahmed - Country Representative

  • Asmale Shibeshi - Regional Programme Coordinator

  • John Livingstone - Regional Policy Officer

  • Abdiasiis Yusuf Bakaal - Assistant Administrative & Logistics Officer

The Aston Team

  • Dr Philip Davies - Mechanical Engineering & Design

  • Opus Igobo - Electrical Engineering, Mechanical Engineering, Environmental Engineering

  • Dr Takeshi Akinaga - Research Fellow

The First Days of Construction

With official confirmation that the site was ready early this week, we have worked fast to begin the project; Karl Fletcher handled container inspections at Berbera Port to prepare for their transfer to the site whilst I and team PENHA prepared final logistics for the construction phase.

 

The site was cleared to prepare for the build with the use of an earth mover

 

Three Containers were brought to the site with one container being fully unloaded before it returned to the port

 

Site surveying and materials organisation began yesterday (Thursday 04/05/2017) and with Fridays being the weekend in Somaliland, construction continues Saturday.It has been a long journey and it is a great milestone for construction to have begun. Stay tuned for updates on the construction as we progress, we are looking forward to an amazing next few months

 

 

← Two Weeks In